Solar panels at the Port of València will generate 22% of the energy it consumes
València, 17 April 2024 – The Muelle Príncipe Felipe solar installation is now 100% operational. The infrastructure was connected to the electricity grid in a trial period in December and, since January 2024, it has been operating at full capacity, supplying an average of 3.5% of the energy consumed by the site. The importance of …
Continue reading “Solar panels at the Port of València will generate 22% of the energy it consumes”