September the 29th 2017

In the point referred to the report of the president in the Board of Directors of the Port Authority of Valencia has been informed on:

  • The good traffic results of last August which became the best month of the August history in Valenciaport with a total of 452,642 TEU moved, 8.69% more than the previous year. This figure has allowed consolidating the path of growth with a total of 3,200,935 TEU, a 1.44% more. With regard to total traffic, until August, Valenciaport has handled 49.07 million tonnes, a figure that represents a growth of 2.85%.
  • The consolidation of the Valencia-Mostaganem line. Paso Del Estrecho operation, which concluded on September 15, accumulated 68,437 passengers and 21,410 vehicles.
  • The good reception of the regular line between Gandia and Ibiza started this year and which, until the end of August, has been used by more than 27,000 passengers.
  • The remodeling started on the Valencia-Zaragoza line which has made it possible for the Figueruelas plant to announce that since October 3 trains per week will be sent to the port of Valencia, a traffic that has been diverted to the port of Tarragona.

In addition, the Board of Directors of the Port Authority of Valencia has approved the following agreements:

  • Item 3. Licensing for the provision of port service for loading, stevedoring, unloading, and goods transfer in the multipurpose terminal of the port of Sagunto to BERGÉ MARÍTIMA, S.L. for a period of 6 years. This license is granted after the expiration of the previous one.
  • Item 4. Licensing for the provision of port service for loading, stevedoring, unloading, and goods transfer in the multipurpose terminal in the Port of Sagunto to INTERSAGUNTO TERMINALES, S.A. for a period of 15 years. This license is granted after the expiration of the previous one.
  • Item 5. Authorization for the provision of the commercial service for the collection and transport of non-regulated waste by Marpol 73/78 in the ports of Valencia, Sagunto and Gandia, to SEROIL VALENCIA S.L. for a period of 3 years.
  • Item 6. Authorization for the provision of a commercial service for the collection and transport of non-regulated waste by Marpol 73/78 to ENVIRONMENTAL SERVICES OF VALENCIA, S.L. for a period of 3 years.
  • Item 7. Approval of extension of the electricity supply by IBERDROLA CLIENTES S.A.U. until the final resolution of the supply contract tendered on March 8, 2017.
  • Item 8. Approval of modification of the resolution of substantial modification of the concession holder ownership of GALP ENERGÍA ESPAÑA S.A.U approved in the Board of Directors of May 26, 2017, which limits the conditions of the risk limitation of the cost of dismantling the facility.
  • Item 9. Approval of non-substantial modification of the MEDITERRANEAN SHIPPING COMPANY TERMINAL VALENCIA, S.A. in the Port of Valencia by extension of 23,348 m2 of concession area in the east area.
  • Item 10. Refusal of the request for administrative concession made by the U.T.E. URBASER, S.A – MARPOL LEVANTE, S.L., for the construction and operation of a plant for reception and storage of oily waters of bilges and other assimilable liquid bulk from vessels.
  • Item 11. Approval of the request for authorization of indirect transmission of the concession held by VULKAN SHIPYARD, S.L. in the Port of Sagunto, by purchase and sale of shares.
  • Item 12. Approval of the non-substantial modification of the concession of occupation of public domain in the Port of Sagunto of which it holds INTERSAGUNTO TERMINALES, S.A. for the temporary reduction of the concession area in 19,000 m2 as well as the minimum traffic required, until December the 31st 2019 or previously if the PIF of Sagunto was available.
  • Item 14. Authorization sponsorship of the “XVI Business Meeting ASECAM”.