|
View of the PortPallet cranes |
Valenciaport has high-throughput specialised installations for all types of traffic (liquid bulk, solid bulk, conventional general goods, general containerised goods and passengers):
- Over 12,000m of docks with depths of up to 17 metres providing convenient stopovers for even the largest container-carrying vessels.
- Over 30 gantry cranes used especially for handling general containerised and non-containerised goods.
- Approximately 300 hectares of total tank area.
In addition, there is an advanced network of land road and rail links (toll-free dual carriageway to Madrid) with good connections to major production centres on the peninsula. There is also quick road access - 15' trip - to the international airport.
|
Type of goods
|
Berthing line |
Depth (metres) |
Others |
|
|
Metres |
% |
|
|
|
|
|
Public Container Terminal |
1,820 |
13.84% |
16 |
13 gantry cranes |
|
|
Multi-purpose Terminals |
1,779 |
13.52% |
7-14 |
10 gantry cranes |
|
|
Roll-On Roll-Off Terminals |
577 |
4.39% |
16-17 |
- |
|
|
Solid bulk Terminals |
1,463 |
11.12% |
11-16 |
14 gantry cranes |
|
|
Liquid bulk Terminals |
435 |
3.31% |
12 |
- |
|
|
General Goods Terminals |
3,902 |
29.66% |
9-14 |
14 gantry cranes
Steel products
Regasification plant (Sagunto)
Wood and paper |
|
|
Passenger, Cruiser tourism and Ro-Ro Terminals |
916 |
6,96% |
7-11 |
- |
|
|
Other docks for trade and navigation services |
1,427 |
10.85% |
7-14 |
- |
|
|
Fishing docks |
835 |
6.35% |
3-8 |
- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
To respond appropriately to the traffic requirements foreseen in accordance with the Valencia Port Authority Strategic Plan, which will double current levels by 2015, reaching the amount of 68 million tonnes and 4 million TEUs, the Valencia Port Authority plans to expand its infrastructure and port zones with all due respect for the environment:
Expansion plans for the ports of Sagunto and Valencia
|